Environment with high efficiency is established by means of automation.
What is essential is “Safety management”.
The factory No.1 carries out their jobs by using their own equipment layout and ideas to respond to the customers trust complying with laws.
Outline of re-inspection
By internally developing a residual gas automatic collection system to automatically perform and vacuum collection of residual liquid and residual gas, we aims at higher efficiency of the working process, and realize safe and ensured working environment. In the pressure test,we use two lines of non-water jacket method by dual automatic pressure test machine,so that only one operator is able to manage the process from pouring water to drying.
In the coating process,we introduced two units of automatic electrostatic powder coating machines for coating with two colors (gray and beige). By using the powder coating, we can eliminate the loss of paints, and also less use of paint thinners for improving the working environment.
For entering the items such as company name and legal letters that are designated by the law, we have improved the quality and production efficiency since we introduced full automatic printers.
By using the full automatic system line covering the process from receiving to shipment, we totally control the data link among machines for establishment of smoother working environment.
Re-inspection process
Receiving work
Residual gas collection,and primary external appearance inspection
Removing valves
Pressure test
Shot-blasting machine
Secondary external appearance inspection
Carved seal(full automatic)
Overall view of coating room
Automatic electrostatic powder coating machine
Coating
Baking
Installation of valves
Automatic printer
Completed items ready for shipment
Pressure test equipment for special cylinders